Today we had our performance and technical run.
Technical Run
We done this from 8:55-9:55 and then 11:15-12:00. In the first hour we done the technical run, we ran half of our scenes with the lights and sound and also decided that we should run our scenes into each other instead of having blackouts between each. This showed that we were still the same characters and were natural in a house. Not stopping all the time and suddenly being in a different place. After half of our scenes were done we decided to top and tail each scene. We took the first lines and last lines of each scene and went to our opening then closing positions of the scenes. This gave the technical people an idea of when and when not to give black outs and also play the music whilst we changed the set or actors.
No comments:
Post a Comment